In brief
Organize can material, colour, mandatory copy and artwork approval before a design becomes a packaging configuration.
How should the can surface be described?
Describe the can surface with the material and presentation details under discussion, so the artwork conversation stays attached to the intended package.
- Can material
- Presentation
- Artwork context
How can colour and required copy be controlled?
Keep colour and required copy in the same controlled artwork record, with the version that the team is currently reviewing clearly identified.
- Colour
- Required copy
- Controlled version
When is artwork ready for approval?
Artwork is ready to enter approval review when the material, colour, copy and current version can be checked together against the project record.
- Artwork version
- Approval review
- Project record